Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 2 of 9 <br /> BULLDOZER WORK <br /> Task description: Rough grade working face from 1:1 to 3:1 <br /> Site: Beeman Pit#1 Permit Action: 2023 Inspection Permit/Job#: M2002009 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 5/8/2023 County: Pueblo Filename: M009-001 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 1-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $124.85 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper own. $16.3 8 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $4.30 50 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $283.20 <br /> Total Fleet Cost/Hour: $283.20 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 22,147 <br /> Swell factor: 1.000 <br /> Loose volume: 22,147 LCY <br /> Source of estimated volume: Permit Application Adequacy Response/DRMS 2002 <br /> Estimate <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 250 feet <br /> Unadjusted hourly 377.8 LCY/hr <br /> production: <br /> Materials consistency Consolidated stockpile 1.0 <br /> description: <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 4,800 feet <br /> Material weight: 2,900 lbs/LCY <br /> CIRCES Cost Estimating Software <br />