Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Updated cost estimate for the Beeman Pit#1 <br /> Site: Beeman Pit#1 Permit Action: 2023 Inspection Permit/Job#: M2002009 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 5/8/2023 County: Pueblo Filename: M009-000 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Rough grade working face from 1:1 to 3:1 DOZER 1 123.70 $35,031 <br /> 002 Spread 6 inches of topsoil over 20 acres DOZER 1 89.37 $25,308 <br /> 003 Revegetate 20 Acres REVEGE 1 20.00 $30,479 <br /> 004 Mob/Demob MOBILIZE 1 2.72 $2,192 <br /> SUBTOTALS: 235.79 $93,010 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,879 <br /> Performance bond: 1.05 Total= $977 <br /> Job superintendent: 117.90 Total= $8,857 <br /> Profit: 10.00 Total= $9,301 <br /> TOTAL O&P= $21,014 <br /> CONTRACT AMOUNT(direct+O&P)= $114,024 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $4,846 <br /> Reclamation management and/or administration: 5.00 $5,701 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $32,061 <br /> TOTAL BOND AMOUNT(direct+indirect)= $125,071 <br />