Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 3 of 9 <br /> Weight description: Sand and gravel-Dry <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.200 (SLOT) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4739 <br /> Adjusted unit 179.04 LCY/hr <br /> production: <br /> Adjusted fleet 179.04 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $1.582/LCY <br /> Total job time: 123.70 Hours <br /> Total job cost: S35,031 <br /> CIRCES Cost Estimating Software <br />