My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-24_REVISION - M1998038 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998038
>
2023-04-24_REVISION - M1998038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 8:48:58 AM
Creation date
4/24/2023 9:23:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998038
IBM Index Class Name
Revision
Doc Date
4/24/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
James H. Kirkland- Kirkland Construction R.L.L.P.
Type & Sequence
SO1
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Length Grade Res. Rolling Total Res. Travel Time <br /> (feet) (%) Res. (%) (%) (minutes) Source <br /> Haul Route: 475 0.00 3.00 3.00 0.3861 (Cat HB) <br /> Return Route: 475 0.00 3.00 3.00 0.3608 (Cat HB) <br /> Total Travel Time:_ 0.7469 minutes <br /> Total Cycle Time: _ 1.2069 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 4.30 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-120%) 1.100 <br /> Adjusted Capacity: 4.73 LCY <br /> Job Condition Correction Factors <br /> Site Altitude:4500 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: _ 235.15 LCY/Hour <br /> Adjusted Hourly Unit Production:_ 195.18 LCY/Hour <br /> Adjusted Hourly Fleet Production:_ 390.35 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 2 Loader(s) Total_job time: 60.84 Hours <br /> Unit cost: $0.615 /LCY Total job cost: $14,603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.