Laserfiche WebLink
WHEEL LOADER—LOAD AND CARRY WORK <br /> Task description: Reclaim HiLyhwall in the 200' buffer zone <br /> Site: Two Rivers Permit Action: 2023 Inspection Permit/Job#: M 1998038 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 4/17/2023 County: Pueblo Filename: M038-002 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 950H Horsepower:_ 197 <br /> Attachment 1: ROPS Cab Shift Basis:_ 1 ner day <br /> Data Source:_ CRG <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $46.76 NA <br /> Operating Cost/Hour: $37.28 100 <br /> Operator Cost/Hour: $35.97 NA <br /> Total Unit Cost/Hour: $120.01 <br /> Total Fleet Cost/Hour: S240.02 <br /> MATERIAL QUANTITIES <br /> Initial volume: 19.000 CCY Swell factor: 1.250 <br /> Loose volume: 23,750 LCY <br /> Source of estimated volume: Division of Reclamation,Mining& Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION 0.500 minutes <br /> Unadjusted Basic Cycle Time(load,dump, <br /> Loader Cycle Time: maneuver): <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Bank or broken material 0.04 0.040 (Cat HB) <br /> Stockpile: No adjustment-factor not applicable 0.00 0.000 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders- -0.040 (Cat HB) <br /> 0.04 <br /> Operation: Constant operation-0.04 -0.040 (Cat HB) <br /> Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.040 minutes <br /> Adjusted Basic Cycle Time: 0.460 minutes <br /> Rolling Resistance—Road Conditions <br /> Haul: Film. smooth,rolling,dirt/It. surfaced,watered.maintained 3.0 <br /> Return: Firm, smooth,rolling,dirt/It. surfaced,watered.maintained 3.0 <br /> Haul and Return Time <br />