Laserfiche WebLink
Weight description: Decomposed rock-75%Rock,25%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: <br /> Dozing method: <br /> Visibility: <br /> Job efficiency: <br /> Spoil pile: <br /> Push gradient: <br /> Altitude: <br /> Material Weight: <br /> Blade type: <br /> Net correction: 0.4257 <br /> Adjusted unit 435.45 LCY/hr <br /> production: <br /> Adjusted fleet 435.45 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: S0.511/LCY <br /> Total job time: 52.57 Hours <br /> Total job cost: $11,697 <br />