My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-24_REVISION - M1998038 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998038
>
2023-04-24_REVISION - M1998038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 8:48:58 AM
Creation date
4/24/2023 9:23:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998038
IBM Index Class Name
Revision
Doc Date
4/24/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
James H. Kirkland- Kirkland Construction R.L.L.P.
Type & Sequence
SO1
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> Task description: Grade Highwalls to 3H:1V Pushdown <br /> Site: Two Rivers Permit Action: 2023 Inspection Permit/Job#: M1998038 <br /> PROJECT IDENTIFICATION <br /> Task ff: 001 State: Colorado Abbreviation: None <br /> Date: 4/11/2023 County: Pueblo Filename: M038-001 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D7R DS XR Series II <br /> Horsepower: 240 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRGI <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $92.78 NA <br /> Operating Cost/Hour: $79.33 100 <br /> Ripper own. $g 37 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $2.00 40 <br /> Operator Cost/Hour: $40.04 NA <br /> Total unit Cost/Hour: $222.51 <br /> Total Fleet Cost/Hour: $222.51 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 16,008 <br /> Swell factor: 1.430 <br /> Loose volume: 22,891 LCY <br /> Source of estimated volume: 4098ft msrd HW,(ex.200' area)20' estimated max hw <br /> height <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly 1,022.9 LCY/hr <br /> production: <br /> Materials consistency Rock,well ripped or blasted 0.8 <br /> description: <br /> Average push -5 % <br /> gradient: <br /> Average site altitude: 4,500 feet <br /> Material weight: 3.300 lbs/LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.