My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-24_REVISION - M1998038 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998038
>
2023-04-24_REVISION - M1998038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 8:48:58 AM
Creation date
4/24/2023 9:23:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998038
IBM Index Class Name
Revision
Doc Date
4/24/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
James H. Kirkland- Kirkland Construction R.L.L.P.
Type & Sequence
SO1
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Two Rivers Pit DRMS Reclamation Cost Estimate <br /> Site: Two Rivers Permit Action: 20231nspection Permit/Job#: M1998038 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 4/11/2023 County: Pueblo Filename: M038-000 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Form Flee Task <br /> Task Description Used t Hours Cost <br /> Size <br /> 001 Grade Highwalls to 311:1V Pushdown DOZER 1 52.57 $11,697 <br /> 002 Reclaim Highwall in the 200'buffer zone LOADER 2 60.84 $14,603 <br /> 003 Spread 6 inches of topsoil over 99 acres SCRAPERI 1 62.12 $136,975 <br /> 004 Revegetation of 99 acres REVEGE 1 99.00 $186,464 <br /> 005 Mob MOBILIZE 1 8.88 $22,340 <br /> SUBTOTALS: 283.41 $372,079 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total— $7,516 <br /> Performance bond: 1.05 Total= $3,907 <br /> Job superintendent: 141.70 Total— $10,646 <br /> Profit: 10.00 Total— $37,208 <br /> TOTAL O&P— $59,277 <br /> CONTRACT AMOUNT(direct+O&P)— $431,356 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 6.59 Total— $28,426 <br /> Reclamation management and/or administration: 4.89 $21,093 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $109,296 <br /> TOTAL BOND AMOUNT(direct+indirect)= $481,375 <br />
The URL can be used to link to this page
Your browser does not support the video tag.