My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-24_REVISION - M1998038 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998038
>
2023-04-24_REVISION - M1998038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 8:48:58 AM
Creation date
4/24/2023 9:23:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998038
IBM Index Class Name
Revision
Doc Date
4/24/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
James H. Kirkland- Kirkland Construction R.L.L.P.
Type & Sequence
SO1
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> Task description: Spread 6 inches of topsoil over 99 acres <br /> Site: Two Rivers Permit Action: 20231nspection Permit/Job#: M1998038 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 4/17/2023 County: Pueblo Filename: M038-003 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 ner day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: Cat D7R DS XR Series 11 <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 3,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 10 NA NA 50 50 <br /> Ownership cost/hour: $264.49 $92.78 NA NA $114.80 $14.98 <br /> Operating cost/hour: $296.10 $7.93 NA NA $39.70 $16.66 <br /> %Utilization-ripper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $8.37 NA NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Operator cost/hour: $47.07 $40.04 NA NA $46.87 $0.00 <br /> Unit Subtotals: $607.66 $149.12 NA NA $201.37 $31.64 <br /> Number of Units: 3 1 0 0 1 1 <br /> Group Subtotals: Work: $1,972.10 Support: $0.00 Maint: $233.01 <br /> Total work team cost/hour: $2,205.11 <br /> MATERIAL QUANTITIES <br /> Initial volume: 79,860 CCY Swell factor: 1.000 <br /> Loose volume: 79,860 LCY <br /> Source of estimated volume: Replacing 6"of topsoil over—99 acres <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION Scraper Bowl(volume)Basis: <br /> Material weight: 2.100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Loam Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.