Bid Item #3 Up to 2,000 cubic yards of limestone waste rock must be moved from the waste <br /> pile at the water tunnel level to the Butte Mill Tailings. The waste rock can be moved by front- <br /> end loader, trucks, or any other manner approved by the Project Manager. The limestone waste <br /> rock will be spread over the most erosive portions of the tailings and along the drainage channel <br /> first. The limestone will be graded to a minimum depth of 3 inches. Placement of the limestone <br /> waste rock will be directed by the Project Manager <br /> If there are insufficient funds to move the entire 2,000 cubic yards of waste rock, the yardage <br /> moved will be determined by the funds remaining after completing Bid Item #1. <br /> Return by 4:00 p.m., September 8, 1999 to: <br /> Yvonne Brannon <br /> 1313 Sherman St., #215 <br /> Denver, CO 90203 <br /> Fax (303) 832-8106 <br />