Laserfiche WebLink
Butte Tailings Regrading Project <br /> PKA-0-1077 <br /> Bid Schedule <br /> UNIT <br /> ITEM # DESCRIPTION AMOUNT UNIT COST TOTAL <br /> 1. Mobilization/ 1 Job N/A $ <br /> Demobilization <br /> 2. Dozer with operator, 40 Hours $ $ <br /> per specs. <br /> 3. Move waste rock, per 2,000 C.Y. $ $ <br /> specs <br /> GRAND $ <br /> TOTAL <br /> Contractor Date <br /> Signature Phone <br /> Address <br /> Tax ID# <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />