Laserfiche WebLink
out in order to install polyurethane foam. Site 38 should be monitored frequently because of the <br /> site's unstable and collapsing nature. Site's 41a and 41b were additionally filled, but may continue <br /> to subside due to the large school buses located inside the stopes. Mine waste at site 39 was <br /> moved away from the creek and placed against the slope and adjacent to the number 39 adit <br /> backfill. <br /> Project Manager Senior Project Manager <br /> �1117/2-609 ;1 - 6' <br /> DateDate Date <br /> 2) 4) <br /> Cer a)AMLIS (Deb)/b) BrassCap(Yvonne;then to Kristin for filing) <br /> 1./r/r) <br /> Date Date <br /> As of 05/14/09 <br />