My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-02_PERMIT FILE - M2022013 (12)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-02-02_PERMIT FILE - M2022013 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 3:57:19 PM
Creation date
2/2/2023 3:31:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
2/2/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response #2
From
Raptor Materials LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Raptor Materials First Adequacy Response <br /> It does: <br /> All affected lands between the extraction limits and remaining above the <br /> anticipated high-water marl: of the basins will be capped with a minimum of six <br /> (6.0±) inches of soil, as supported be Exhibit I&J - Soils and Vegetation <br /> Information. Timing and use of soil are detailed further under Exhibit I&J - Soils <br /> and Vegetation Information and Exhibit L - Reclamation Costs. Where compacted <br /> lands exist, and are to be revegetated, those locations will be. prior to re <br /> VARRA COMPANIES,INC. TWO RIVERS SAND GRAVEL AND R ESE RVOtR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MIING&.SAFETY <br /> OFFICE OF MWED LAND RECLAMATION <br /> Page 16 <br /> 6.4.5 EXHIBIT E -Reclamation Plan <br /> soil application. There are no known areas of compaction at the time of this <br /> application which would require such activity; and ripping remains a contingence <br /> of the application. <br /> Division Second Adequacy Comment <br /> No additional response is required from RM. <br /> 32) The reclamation plan needs to include a clear plan for the storage and <br /> application of topsoil prior to seeding. The plan should include push distances to <br /> the areas and minimum depth. <br /> Raptor Materials First Adequacy Response <br /> Items addressed under #20 and #23, should satisfy this concern. <br /> Division Second Adequacy Comment <br /> It appears that the extensive discussion on soils does not include any information <br /> regarding the quantities of soil in stockpiles or the location of soil piles. This <br /> 381Page <br /> Correspondence to the Colorado Office of Mined Land Reclamation —Reply to Rob Zuber,EPS—Adequacy Letters of 24 June and 5 <br /> August 2022;in the matter of the Two Rivers Sand,Gravel and Reservoir Project—M2022-013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.