Measurement and Payment <br /> Revegetation of the Mine Pit Floor will be measured to the nearest one tenth (0.1) acre and paid at the <br /> unit price per acre bid on the Bid Schedule Item 8.1. The price bid shall include all costs for labor, <br /> materials,equipment and all other items necessary for revegetation as described in these specifications. <br /> Payment for this task will be made only for the unit price shown under Item 8.1 of the Bid Schedule. <br /> Payment shall be as this task is completed and approved by the PROJECT MANAGER. <br /> ITEM 8.2— SLOPE SEEDING & REVEGETATION <br /> Following earthwork activities, the CONTRACTOR shall seed all reclaimed slopes and all areas <br /> disturbed by highwall safeguarding activities that exceed a 4h:1v slope. The specified seed and <br /> indicated amounts shown in Table 2 shall be uniformly distributed utilizing hydro-seeding methods <br /> over all prepared ground areas in a manner that will produce an even stand of grass over the entire <br /> area seeded. All disturbed areas exceeding a 4h:1v slope shall be hydro-seeded unless otherwise <br /> approved by the PROJECT MANAGER. It is estimated that two acres (2 ac)will be reseeded by <br /> hydro-seed. <br /> A. Seed Distribution: A truck or trailer mounted hydraulic seeder shall be used with sufficient <br /> mixing capacity, pressure, and or hose to evenly apply the seed, tackifier, and mulch to <br /> all specified areas and as directed by the PROJECT MANAGER. <br /> B. Fertilizer: No fertilizer is required. <br /> C. Mulch: Hydro-mulch shall be wood fiber based and shall be applied using 1,500 pounds per <br /> acre. The wood fiber mulch should be dyed to ensure uniform coverage. <br /> D. Tackifier: Shall be organic, non-petroleum based and shall be applied at the manufacture's <br /> recommended rate per acre. <br /> E. Seed: The seed mix shown in Table 2 above shall be applied at a rate of 15 pls Ibs/acre. The <br /> seed mix should be the last item placed into the tank and shall not remain in the hydro-seeder <br /> more than 4 hours. <br /> F. Watering: No water beyond what is required for the hydro-seed application will be required. <br /> Measurement and Payment <br /> Revegetation of the slopes will be measured to the nearest one tenth (0.1) acre and paid at the unit <br /> price per acre bid on the Bid Schedule Item 8.2. The price bid shall include all costs for labor, materials, <br /> equipment and all other items necessary for revegetation as described in these specifications. Payment <br /> for this task will be made only for the unit price shown under Item 8.2 of the Bid Schedule. Payment <br /> shall be as this task is completed and approved by the PROJECT MANAGER. <br /> ADDITIONAL BID ITEMS <br /> There are included on the Bid Schedule, several additional bid items. These bid items are not <br /> guaranteed, and will be used only in the event that conditions change on site, and only after approved <br /> by the PROJECT MANAGER. The additional bid items for this project include: <br /> Page 15 of 16 <br />