labor, materials, equipment, transportation and all other items and materials necessary and <br /> incidental to the completion of Item 6.0. <br /> ITEM 7.0— SAFEGUARD NORTHWEST HIGHWALL AND SITE GRADING <br /> The CONTRACTOR will safeguard a five hundred fifty foot (550 ft) long section of highwall averaging <br /> twelve feet (12 ft) in height (See attached Site Plan). Approximately 2,500 cy of material will need to <br /> be graded via cut and fill. Please note this figure is an estimate and the CONTRACTOR is <br /> responsible for verifying all estimates prior to bid submittal. No outside fill or organic matter shall be <br /> utilized for backfill or site grading unless approved by the PROJECT MANAGER. <br /> The highwall will be safeguarded by excavating the top edge of the highwall and using available <br /> onsite materials to grade the highwall down to a slope with three feet of horizontal distance for every <br /> one foot of fall (3h:1v slope). Placed material shall be compacted with mechanical compaction <br /> techniques approved by the PROJECT MANAGER. Thorough compaction shall consist of a <br /> minimum of two (2) passes with a CAT D6 dozer (or equivalent) over all areas so that the marks <br /> overlap one another. Equipment shall be tracked forward in a single pass and return along the same <br /> path. <br /> Final grade elevations must be approved by the PROJECT MANAGER before revegetation begins. <br /> Measurement and Payment <br /> No measurement for payment shall be made for safeguarding the highwall and site grading. Payment <br /> will be lump sum for Item 7.0 on the Bid Schedule. The price bid for Item 7.0 will cover all costs for <br /> completing the activities required under this Task. Payment shall be as this task is completed and <br /> approved by the PROJECT MANAGER. Such payment shall be considered full compensation for all <br /> labor, materials, equipment, transportation and all other items and materials necessary and <br /> incidental to the completion of Item 7.0. <br /> ITEM 8.0— SEEDING & REVEGETATION <br /> Following earthwork activities, the CONTRACTOR shall seed the mine pit floor, newly graded slopes, <br /> and all areas disturbed by reclamation activities. This includes any areas disturbed for access. Any <br /> previously prepared seedbed areas compacted or damaged by interim rains, traffic, or other cause, <br /> shall be reworked to restore the ground condition previously specified prior to seeding. It is estimated <br /> that eight (8) acres will need to be reseeded. Areas will be revegetated utilizing seed drilling and hydro- <br /> seed methods described in Item 8.1 and Item 8.2 below and in accordance to the Revegetation <br /> Specifications, Section 20.0 in the General Bid Specifications, 2009. <br /> Application of materials must be accomplished in a manner that results in a consistent, complete, <br /> through and even distribution of seed to all ground surfaces. Seeding methods will be used so as to not <br /> disturb existing vegetation established on site. CONTRACTOR must supply the labor and equipment <br /> required to complete the seed application and mulching. The CONTRACTOR is responsible for <br /> supplying the required seed mix shown in Table 2 below. The seed ticket(s) clearly displaying the <br /> required seed mix and pounds pure live seed must be furnished to the PROJECT MANAGER before <br /> seed application begins. <br /> Page 13 of 16 <br />