Laserfiche WebLink
JET Consulting, Inc. J-2 Contracting Company <br /> Sunset Industrial Pit <br /> In 12/23/2022 <br /> Reclamation Bond Quantities and Costs <br /> ©2022 JAT Cenmdtlm¢.Ing. 22020 Sunset Industrial Pit Rec Bond Calcs <br /> Phase 1 a -64.22 acres (Prior to Exposing Groundwater) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Scarifying-Topsoil/OB Stockpile,Access Road,Plant Site Areas,Loadout Area,Scale 64.22 ac $ 200 $ 12,844 <br /> Topsoil Placement-Topsoil/OB Stockpile,Access Road,Plant Site Areas,Loadout Area,Scale 64.22 ac $ 1,800 $ 115,596 <br /> Revegetate-TopsoiUOB Stockpile,Access Road,Plant Site Areas,Loadout Area,Scale 64.22 ac $ 1,000 $ 64,220 <br /> Removal of foundations for Scale House and Scale 50 cy $ 200.00 $ 10,000 <br /> Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Subtotal Direct Cost $ 205,160 <br /> Total Direct Cost $ 205,160 <br /> Overhead and Profit Cost(12.60%) $ 25,850 <br /> Contract Cost 231,010 <br /> Project Management(9.25%) $ 21,368 <br /> Total Required Financial Warranty For Phase 1a $ 252,379 <br /> Phase 1 - 64.22 acres <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 1 5,158 If $ 305.00 $ 1,573,190 <br /> Removal of Soil from Sediment Ponds and Removal of Berms for Sediment Ponds 16,000 cY $ 2.00 $ 32,000 <br /> Dewatering of Pit for Phase 1 604.00 mg $ 400 $ 241,600 <br /> Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Subtotal Direct Cost $ 1,849,290 <br /> Total Direct Cost $ 1,849,290 <br /> Overhead and Profit Cost(12.60%) $ 233,011 <br /> Contract Cost 2,082,301 <br /> Project Management(9.25%) $ 192,613 <br /> Additional Financial Warranty Required For Phase 1 $ 2,274,913 <br /> Cummu/ative Financial Warranty Required For Phase 1a-1 $ 2,527,292 <br />