Laserfiche WebLink
JET Consulting, Inc. J-2 Contracting Company <br /> Sunset Industrial Pit <br /> In 12/23/2022 <br /> Reclamation Bond Quantities and Costs <br /> ©2022 J!T Conndtlinm Im 22020 Sunset Industnal Pit Rec Bond Calcs <br /> Summary of Unit Coats <br /> Direct costs <br /> Re-applying topsoil 12"thick $1,800.00 /acre <br /> Revegetating disturbed area $1,000.00 /acre <br /> Dewatering full pit $400.00 / million gallons <br /> Phase 1 Slurry Wall Cost $305.00 / linear foot <br /> (0-50 ft @$4/ft-51-70 ft @$7/1t-71-95 ft @$13/ft) <br /> Phase 2 Slurry Wall Cost $305.00 / linear foot <br /> (0-50 ft @$4//t-51-70 ft @$7/ft-71-95 ft @$13/ft) <br /> Scarifying Ground $200 /acre <br /> Mobilization $2,500 lump sum <br /> Overhead and Profit Costs <br /> Liability insurance 1.55% of direct cost <br /> Performance bond 1.05% of direct cost <br /> Profit 10.00% of direct cost <br /> Total Overhead Cost 12.60% of direct cost <br /> Project Management <br /> Engineering and bidding 4.25% of direct cost <br /> Management and administration 5.00% of direct cost <br /> Total Additional Cost 9.25% of direct cost <br />