My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-01-10_PERMIT FILE - M2023001 (28)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2023001
>
2023-01-10_PERMIT FILE - M2023001 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2023 9:46:36 PM
Creation date
1/11/2023 4:31:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023001
IBM Index Class Name
Permit File
Doc Date
1/10/2023
Doc Name Note
Exhibit L - Reclamation Cost
Doc Name
Application
From
J-2 Contracting Company
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JET Consulting, Inc. J-2 Contracting Company <br /> Sunset Industrial Pit <br /> In 12/23/2022 <br /> Reclamation Bond Quantities and Costs <br /> ©2022 JAT ConsolHm Inc. 22020 Sunset Industrial Pit Rec Bond Caics <br /> Phase 2a - 20.95 acres (Prior to Exposing Groundwater) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Scarifying-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 20.95 ac $ 200 $ 4,190 <br /> Topsoil Placement-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 20.95 ac $ 1,800 $ 37,710 <br /> Revegetate-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 20.95 ac $ 1,000 $ 20,950 <br /> Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 65,350 <br /> Overhead and Profit Cost(12.60%) $ 8,234 <br /> Contract Cost $ 73,584 <br /> Project Management(9.25%) $ 6,807 <br /> Additional Financial Warranty Required For Phase 2a $ 80,391 <br /> Cummulative Financial Warranty Required For Phase la-2a $ 2,607,683 <br /> Phase 2 - 20.95 acres <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 2 2,297 If $ 305.00 $ 700,585 <br /> Dewatering of Pit for Phase 2 79.00 mg $ 400 $ 31,600 <br /> Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 734,685 <br /> Overhead and Profit Cost(12.60%) $ 92,570 <br /> Contract Cost 827,255 <br /> Project Management(9.25%) $ 76,521 <br /> Additional Financial Warranty Required For Phase 2 $ 903,776 <br /> Cummulative Financial Warranty Required For Phase la-2 $ 3,511,459 <br />
The URL can be used to link to this page
Your browser does not support the video tag.