Laserfiche WebLink
Cost Summary Worksheet Cont'd Task 4 000 Page 3 of 4 <br /> 113 Shrub Transplants as per operator NA 1 40.00 $155,204 <br /> 120 Seal 1 remaining Borehole(MR212 others were BOREHOLE 1 4.00 $4,253 <br /> mined through) <br /> 121 Seal 20 Developmental Drill Holes BOREHOLE 1 111.00 $56,561 <br /> 122 Seal Monitoring Wells BOREHOLE 1 74.00 $115,668 <br /> 123 Sealing Stations 1-4 BOREHOLE 1 6.24 $9,291 <br /> 124 Seal 4 Monitoring Wells(MR217) BOREHOLE 1 6.24 $31,028 <br /> 125 Seal GLEV-1,GLEV-2 and GLEV-3 Wells BOREHOLE 1 4.00 $4,701 <br /> 126 Seal Monitoring Well 95-LW9(MR223) BOREHOLE 1 7.00 $8,240 <br /> 127 Sealing wells CY-1,CY-2,CY3 as per operator NA 1 8.00 $7,422 <br /> 128 Reveg for 20 x.3 acres drillholes REVEGE 1 6.00 $4,830 <br /> 129 Regrade .3acres x 20 drill pads DOZER 1 60.58 $16,996 <br /> 130 Demolish structures,remove materials and debris DEMOLISH 1 100.00 $788,371 <br /> 131 Culvert Removal and Disposal DEMOLISH 1 60.00 $141,229 <br /> 132 Mobilize and Demobilize from Hayden,CO MOBILIZE 1 5.34 $75,650 <br /> 133 Drill and Blast L Pit 1,776,482 BCY NA 3 407.00 $640,555 <br /> 134 Drill and Blast Ash Pit 106,474 BCY NA 3 37.75 $43,232 <br /> 135 Drill and Blast J Pit 513,911 BCY NA 3 142.00 $193,985 <br /> 136 Place holder NA 0 0.00 $0 <br /> LO1 Regrade L Pit X-sec:407,200 DOZER 4 38.19 $87,365 <br /> L02 Regrade L Pit X-sec:406,700 DOZER 4 96.29 $220,258 <br /> L03 Regrade L Pit X-sec:406,200 DOZER 4 54.48 $124,607 <br /> L04 Regrade L Pit X-sec:405700 DOZER 4 71.33 $163,163 <br /> L05 Regrade L Pit X-sec:405,200 DOZER 4 386.09 $883,157 <br /> L06 Regrade L Pit X-sec:404,700 DOZER 4 428.34 $979,780 <br /> L07 Regrade L Pit X-sec:404,200 DOZER 4 269.44 $616,327 <br /> L08 Regrade L Pit X-sec:403,700 DOZER 4 58.40 $133,596 <br /> L09 Regrade L Pit X-sec:403,200 DOZER 4 61.03 $139,605 <br /> L10 Regrade L Pit X-sec:402,700 DOZER 4 178.08 $407,352 <br /> L11 Regrade L Pit X-sec:402,200 DOZER 4 339.20 $775,880 <br /> L12 Regrade L Pit X-sec:401,700 DOZER 4 88.07 $201,461 <br /> L13 Regrade L Pit X-sec:401,200 DOZER 4 62.00 $141,825 <br /> L14 Regrade L Pit X-secs:400,700 and 400,200 DOZER 4 47.12 $107,774 <br /> L15 Regrade L PIt(Truck/Excavator) TRUCKI 1 1,459.70 $2,602,304 <br /> L16 Seed L Pit:Rangeland with Shrubs REVEGE 1 804.00 $647,162 <br /> L17 Regrade L Pit North Haul road.6.5 ac X 9 ft th. DOZER 2 32.35 $36,981 <br /> L18 Replace Topsoil on L Pit(Scrapper) SCRAPERI 1 166.47 $971,347 <br /> L19 Replace Topsoil on L Pit(Track/Excavator) TRUCKI 1 708.38 $1,721,686 <br /> LN20 Site Maintenance;Rill and Gully Repair and Pond SITEMAINT 1 600.00 $240,462 <br /> Cleaning ENANCE <br /> NO1 Regrade N Pit DOZER 2 1,071.15 $1,225,074 <br /> NO2 Backfill and Grading N Pit TRUCKI 1 2,182.12 $4,596,880 <br /> NO2a Backfill and Grading I Pit TRUCKI 1 156.39 $502,618 <br /> NO2b Backfill and Grading J Pit DOZER 2 450.41 $515,134 <br /> NO3 Backfill and Grading C Pit TRUCKI 1 1,966.22 $6,320,085 <br /> N13 Replace Topsoil on C Pit SCRAPERI 1 90.64 $528,907 <br /> N14 Re lace Topsoil on N Pit(Scraper) SCRAPERI 1 169.86 $991,133 <br /> N14a Replace Topsoil on Pit(Truck/Excavator) TRUCKI 1 39.08 $143,647 <br /> N15 Replace Topsoil in I Pit SCRAPERI 1 13.12 $73,667 <br /> N16 Replace Topsoil on J Pit TRUCKI 1 35.62 $114,491 <br /> N17 Replace Topsoil on I/J Pit TRUCKI 1 14.36 $46,154 <br /> N18 Seed N PitRangeland w/o shrubs(<6700 ft.) REVEGE 1 44.00 $21,586 <br /> N18a Seed N Pit:>6700 ft.-Rangeland with Shrubs REVEGE 1 244.00 $196,749 <br /> N19 Seed J Pit without shrubs(Range C) REVEGE 1 66.00 $54,660 <br /> CIRCES Cost Estimating Software <br />