Laserfiche WebLink
November 15,2022 C-1982-056/Foidel Creek Mine ZTT <br /> r^ <br /> IP- <br /> Iaw- <br /> Pond D. Pond B. <br /> The area between the wash plant and Pond D had the drainage reestablished and properly is graded into Pond D. <br /> No excess water was observed in the area. This area was noted for maintenance in the Division's October <br /> inspection and has been completed. <br /> Drainage reestablishment. <br /> Rock dust tank pads and associated small area exemptions were inspected with no issues observed. <br /> In general,facilities surface drainage appeared to be functional as no excess water ponding was observed. <br /> Perimeter ditches around the facilities area appeared to be functional as all disturbed runoff was contained within <br /> the approved disturbance boundaries.At the time of this inspection the sump pipe at the back of building still <br /> needed to be connected to the building as documented in the previous inspection report.However,all surface <br /> runoff near the building is contained within the disturbance boundary and properly reports to the associated <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 4 of 6 <br />