My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-11-21_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2022-11-21_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 1:51:53 PM
Creation date
11/21/2022 1:42:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
11/21/2022
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, LLC
Inspection Date
11/15/2022
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 15,2022 C-1982-056/Foidel Creek Mine ZTT <br /> Fish Creek Tipple pond y y Reclaimed tipple Fish creek <br /> Fish Creek Borehole y N mine water (w/ Fish creek 3 cell pond, discharge at site <br /> flock added) (site 115) 115 triggers additional <br /> sampling requirements. <br /> 18LT vent shaft ponds N N pad Pad is not active <br /> Pond F N N runoff from Foidel <br /> facilities <br /> Pond G N N Surface Runoff Foidel <br /> from laydown <br /> Area <br /> Pond E y y Facilities and Foidel Cleaned Fall 2022 <br /> roads <br /> Area No. 1 Pond (Pit y N mine, sumps, Pond D <br /> Pond) diversion dich <br /> Pond D y y Wash plant Foidel Cleaned Fall 2022 <br /> facilities, pit <br /> pond <br /> Pond B y N Bob pile, road Foidel Cleaned Fall 2022 <br /> Pond C N N Facilities <br /> Pond T - - Laydown area Foidel v-notch weir, culvert under <br /> railway always trickling <br /> Facility Treatment y N Facilities water GW discharge Currently approved to go to <br /> ponds the million gallon tank. <br /> Revision is needed to update <br /> PAP. <br /> Stream buffer zone @ NA NA Buffer marked by Buffer zone was being <br /> train load-out barrels and sign. maintained at Nov 2022 <br /> inspection. Buffer zone <br /> needs to continue to be <br /> protected from winter <br /> plowing, mag chloride, and <br /> coal overflow from train. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.