Laserfiche WebLink
November 15,2022 C-1982-056/Foidel Creek Mine ZTT <br /> sediment pond. <br /> Due to snow cover, some ditches and maintenance items associated with ditches were not observed.For more <br /> information,please refer to the General Compliance With Mine Plan section of this report. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The rock dust staged at the entrance to 6MN pump house pad was inspected.The pile is scheduled to be removed <br /> per discussions with the mine representative.The pile was within the disturbance boundary. <br /> The following list is ongoing maintenance items listed from previous inspection reports that are ongoing or were <br /> not inspected. <br /> Ongoing Maintenance Items: <br /> • Protect topsoil piles from cattle <br /> • Reseed topsoil piles,pad slopes, and pipeline corridors,at the newer pads(15 left— 18 left) <br /> • Reestablish portal ditch,clear-out cattails and any non-coal waste <br /> • Reestablish ditch F behind the warehouse pad <br /> • Topsoil pile at the 7E cement drop pad will need to be used to reclaim the site or shaped and seeded. <br /> • Spray weeds and Reseed the waste pile topsoil pile <br /> • Protect topsoil piles along the 6MN road during maintenance and snow plowing activities <br /> • Clear vegetation from around the trash rack at pond E and the discharge location <br /> • Topsoil sign is missing at fish creek borehole access road <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11 <br /> Drainage Control; Surface Stabilization; Placement: <br /> The waste pile appeared stable however was primarily snow covered. There was no standing water observed on <br /> the waste pile. The toe of the pile and underdrains appear stable,with no excess water,and culverts were <br /> functional. Refuse was stacked along the top of the pile for future spreading. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3),Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5)and <br /> (6)/4.03.2(5) and(6),Reclamation 4.03.1(7)/4.03.2(7): <br /> New access road associated with the NW Mains Ventilation Shaft was surveyed in with stakes.No construction or <br /> disturbance associated with the new access road has been begun. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 5 of 6 <br />