Laserfiche WebLink
A. Salvage <br /> Topsoil salvage thicknesses and stripping procedures are described in Subsection 16 of <br /> Section 2.04.9. <br /> No additional plans have been approved to salvage topsoil beyond what has currently been <br /> disturbed. <br /> B. Storage <br /> The topsoil pile locations are illustrated on Map 2.05.4-9 and the details are described in <br /> Section 2.05.4(2)(d) subsection 8.0. <br /> C. Redistribution <br /> Details regarding redistribution of topsoil are found in Section 2.05.4(2)(d). ERMR has <br /> established multiple zones for topsoil replacement as shown on Maps 2.05.4-4 and 2.05.4-6. <br /> The zones are based on the volume of topsoil salvaged from each area and represent the <br /> depths of topsoil to be replaced in each area. For the designated Morgan property prime <br /> farmlands, a minimum of 48 inches will be replaced in two separate lifts. Spoil and Soil <br /> Suitability Criteria are presented in Table 2.05.4(2)(d)-lA for the Morgan prime farmland <br /> and in Table 2.05.4(2)(d)-1B for the remaining areas (those north of BB Road). <br /> Regraded spoil will be mechanically loosened and mixed by ripping or approved alternate <br /> forms of scarification in order to decrease compaction, increase aeration and water <br /> movement, and increase plant rooting depths. Bench 1 Surface spoil and Bench 1 Subsoil <br /> Substitute are sampled for the criteria in Table 2.05.4(2)(d)-I and 1 B prior to topsoil <br /> replacement. Subsection 5.0 of Section 2.05.4(2)(d) describes the mitigation plan that will be <br /> employed for surface spoil that is found to be unsuitable. <br /> Topsoil handling and placement procedures are described in Section 2.05.4(2)(d) beginning <br /> with Subsection 10.0. The testing plan to be utilized to verify the suitability of topsoil <br /> replaced is detailed in Subsection 14.0, while Subsection 15.0 describes the remediation <br /> process to be followed should a soil sample parameter fall outside of the allowable limits. <br /> V. Sealing of Drilled Holes and Underground Openings <br /> No changes are proposed for this section. <br /> VI.Use of Explosives <br /> No explosives are requested or needed for this revision. No changes of the findings <br /> document are proposed for this permit revision. <br /> VIL Disposal of Excess Spoil <br /> 14 <br />