My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-05_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2022-10-05_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 2:29:41 PM
Creation date
10/5/2022 2:10:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
10/5/2022
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, LLC
Inspection Date
9/21/2022
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 21,2022 C-1982-056/Foidel Creek Mine TNL <br /> Location Holding discharging source goes to notes <br /> water <br /> 61VIN Reservoir y N mine water NW diversion ditch check <br /> 61VIN ventilation y N pad runoff <br /> shaft site sed <br /> pond <br /> 61VIN wetlands y N Underground Water from ponds is pumped <br /> dewatering to the 61VIN reservoir, no <br /> discharge permit currently <br /> approved at this site <br /> Fish Creek Tipple y y Reclaimed tipple diversion ditch along the N <br /> pond side <br /> Fish Creek y N mine water(flock Fish creek 3 cell pond, discharge at site <br /> Borehole added) 115 triggers sampling at fish <br /> creek downstream. <br /> 18LT vent shaft y N <br /> ponds <br /> Pond F y N runoff from Foidel <br /> facilities <br /> Pond G y N Surface Runoff Foidel <br /> from laydown <br /> Area <br /> Pond E y y <br /> Area No. 1 Pond y N mine, sumps, Pond D Waste pile under-drain was <br /> (Pit Pond) diversion dich not discharging <br /> Pond D y y <br /> Pond B y N Bob pile Foidel 3 cell pond, deltas,frequent <br /> clean out <br /> Pond C N N Generally dry <br /> Pond T N N laydown area Foidel v-notch weir, culvert under <br /> railway always trickling <br /> Facility Treatment y N facilities water GW Currently approved to go to <br /> ponds discharge the million gallon tank. <br /> Revision is needed to update <br /> PAP. <br /> Stream buffer Buffer zone being maintained <br /> zone @ train at Sept 2022 inspection <br /> load-out <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.