My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-10-05_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2022-10-05_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 2:29:41 PM
Creation date
10/5/2022 2:10:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
10/5/2022
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, LLC
Inspection Date
9/21/2022
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 21,2022 C-1982-056/Foidel Creek Mine TNL <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The waste pile appeared stable and the face free of weeds and well vegetated. There was no standing water <br /> observed on the waste pile. The toe of the pile and underdrains appear stable,with no excess water, and culverts <br /> were functional. Waste pile inspection reports have been received by the Division as required. <br /> Topsoil pile at the BOB pile appears stable,well vegetated and undisturbed. <br /> Please clear out the waste rock piles near the wash plant. It appears these are from haul truck overflow and <br /> are in the process of being cleaned up. <br /> Ongoing Maintenance Items: Please address the following items as conditions allow <br /> • Protect topsoil piles from cattle <br /> • Reseed topsoil piles,pad slopes, and pipeline corridors, as needed, specifically around the newer pads. <br /> • Reestablish portal ditch,clear-out cattails and any non-coal waste <br /> • Reestablish ditch F behind the warehouse pad <br /> • Cleanout sump above ponds B and D <br /> • Topsoil pile at the 7E cement drop pad will need to be used to reclaim the site or shaped and seeded. <br /> • Spray weeds and Reseed waste pile topsoil pile <br /> • Protect topsoil piles along the 6MN road during maintenance and snow plowing activities <br /> • Please clear the cattails from around the trash rack at pond E and discharge location <br /> REVEGETATION—Rule 4.15 <br /> Vegetative cover at the wetland ponds,both on the banks and the wetland plants appears to be well established. <br /> 7E and 13 RT pads and road were being reclaimed at the time of inspection it appeared the casing were being <br /> pulled. <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.