Laserfiche WebLink
State of Colorado <br /> DEPARTMENT OF NATURAL RESOURCES <br /> DIVISION OF RECLAMATION,MINING AND SAFETY <br /> Page 4 of 13 <br /> V. PLANT STRUCTURES AND EQUIPMENT REMOVAL <br /> Current and Approved Site Conditions: <br /> All equipment and structures were removed from the site in 2020. <br /> Note that while 8.0 acres of land in Phase IV are used by the operator/permittee,this area is proposed to be <br /> removed from the Reclamation Plan and Permit as part of this Technical Revision and therefore excluded from <br /> this RCE. No stockpiles of processed material or permanent structures are present on Site. <br /> Reclamation Plan Performance Standard (End Use): <br /> The project site is designated as"Commercial/Industrial Development,"with rangeland as an alternative use. <br /> Describe tasks: <br /> None. <br /> Equipment on site wholly owned by operator?: PYES F111NO <br /> None. <br />