Kiewit I Fountain Colony Pit September 6, 2022 <br /> disturbed land remaining. The portions of Phase I and Phase II excluded in this TR have been fully <br /> reclaimed and/or include undisturbed land. Reclamation is complete in Phase III and Phase IV.Attachment <br /> C—Site Photos shows the current reclamation status of each phase from a Site visit conducted on August <br /> 17, 2022. <br /> Currently, Kiewit is occupying approximately 8.0 acres of land within Phase IV for the temporary storage <br /> of various construction equipment. Per TR#4, Phase IV will be removed from the Reclamation Permit and <br /> Plan, and therefore, this temporary storage area will no longer be within the permit and affected land <br /> area. As part of the development, this equipment is planned to be stored in the same general area. <br /> Furthermore, detention basins constructed with riprap were implemented within Phase I, Phase II, Phase <br /> III, and Phase V.These structures will remain at the Site to prevent erosion for future development. <br /> The details of reclamation status are summarized by phase below in Table 2. The acreages in Table 2 <br /> reflect all reclaimed or undisturbed areas with regards to the current Reclamation Permit and Plan prior <br /> to TR#4.This accounts for the estimated 4.0 acres in the permit and affected area that will be subject to <br /> future reclamation. while certain phases or areas within phases are fully reclaimed or undisturbed, they <br /> remain bonded.Therefore, this TR would also revise the bond amount to reflect the reclaimed status of <br /> these areas. Moreover,as described in the approved Reclamation Plan,some areas would not require full <br /> reclamation in the case of industrial and/or commercial development. As such, removal of areas still <br /> subject to final reclamation would be consistent with the Reclamation Plan, given the conforming end <br /> use. <br /> The Reclamation Plan Map provided as Exhibit F—Reclamation Plan Map, Attachment B illustrates the <br /> reclamation status of the Site.The cross-sections displayed on the Reclamation Plan Map show the post- <br /> reclamation surface elevations. <br /> Table 2- Reclamation Activity for Fountain Colony Pit <br /> Phase Acres Reclaimed or Date Reclaimed Reclamation Status <br /> Undisturbed <br /> Phase I 63.9 acres 2007 Partially Complete <br /> Phase II 100.0 acres 2007, 2022 Partially Complete <br /> Phase III 70.1 acres 2008, 2022 Complete <br /> Phase IV 44.9 acres 2008, 2022 Complete <br /> Phase V 31.0 acres 2012, 2022 Partially Complete <br /> 5.0 EXHIBIT F-RECLAMATION PLAN MAP <br /> The Reclamation Plan Map is provided as Exhibit F—Reclamation Plan Map,Attachment B. The revised <br /> map represents the change in the permit and affected land area, as well as depicting the present-day <br /> topography,inclusive of the reclaimed areas.Revised cross-sections are included in this Exhibit that reflect <br /> the current elevation profiles of the Site. <br /> Technical Revision#4 4 Sespe Consulting, Inc. <br />