My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-01_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2022-09-01_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2022 1:13:56 PM
Creation date
9/1/2022 1:08:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
9/1/2022
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
8/23/2022
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 23, 2022 C-1981-012/New Elk Mine JLE <br /> be cleaned out. <br /> Figure 3. Ditch D14, sediment has built up in the ditch which should be cleaned out and the <br /> berm separating the affected land around DWDA #2 and the river needs to be built up and <br /> improved. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br /> Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Pond 008 is holding water but not discharging. The primary and emergency spillways were clear and functional. <br /> The embankment was stable and vegetated. <br /> NECC has excavated sediment that has built up in the sump on the east side of the conveyor in the drainage that <br /> discharges to containment area 45. According to Mr. Mason they were not able to fully clean out behind the check <br /> dam of the sump due to the wet ground conditions. Once the sump is cleaned out,NECC should repair and/or <br /> modify the check dam used at this sump. The current straw bales are beginning to fail. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 4 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.