Laserfiche WebLink
Table A-2.8 Dozer Correction Factors Page No.7 <br />Correction Factor for Pits From TR-124 Circes Est.Correction Factor for Pits <br /> <br />Downhill Push Uphill Push <br />Operator skill 0.750 Operator 0.8 <br />Mat Consistency 1.200 Mat Consistency 1 <br />Dozing Method 1.200 Dozing Method 1.17 <br />Visibility 0.800 Visibility 0.800 <br />Job Efficiency 0.830 Job Efficiency 0.790 <br />Spoil Pile 0.900 Spoil Pile 1.000 <br />Push gradient 1.225 see X-sect Grade Adjustment 1 see X-sect <br />Altitude:1.000 Material Weight 0.98 <br />Material Weight 0.697 Efficiency 0.83 <br />Blade Type 1.000 Visibility 0.9 <br />Total 0.5511 Total Correction 0.69 <br />Correction Factor for Roads Correction Factor for Impoundments and Diversions <br /> <br />Operator skill 1.00 Operator skill 1.00 <br />Mat Consistency 1.00 Mat Consistency 1.00 <br />Dozing Method 1.00 Dozing Method 1.00 <br />Visibility 1.00 Visibility 1.00 <br />Job Efficiency 0.83 Job Efficiency 0.83 <br />Spoil Pile 0.80 Spoil Pile 0.80 <br />Push gradient 1.00 see X-sect Push gradient 1.00 see X-sect <br />Altitude:1.00 Altitude:1.00 <br />Material Weight 1.000 Material Weight 1.000 <br />Blade Type 1.00 Blade Type 1.00 <br />Total 0.6640 Total 0.6640 <br />Note: In Circes, these correction factors are applied to each task (i.e. Cross-section).