Laserfiche WebLink
Table A-3.1 Summary of regrade costs Page No.8 <br /> Adjusted <br /> Push/Haul Productivity Correction Productivity Equipment Unit Cost Total <br />Pit Cubic Yards Distance (ft.)(cy/hr) Factor (lcy/hr) Hours ($/hr) Cost($) <br />I Pit Middle 906,020 2,616 1,186 1.00 1186 255 3,867.53$ 984,847.97$ <br />J Pit West 887,125 2,616 1,186 1.00 1186 497 3,867.53$ 642,009.98$ <br />Total 1,793,145 1,186 1.00 1186 752 3,867.53$ 1,626,857.95$ <br />Drill and Blast Cubic Yards Benching $Drilling $Blasting $Total $ <br /> <br />None - -$ -$ -$ -$ <br />Total - -$ -$ -$ -$ <br /> Adjusted <br /> Push Productivity Correction Productivity Equipment Unit Cost Total <br /> Description Cubic Yards Distance (lcy/hr) Factor*(lcy/hr) Hours ($/hr) Cost($) <br />Roads-Ripping <br />Roads-Regrade <br />Impoundments <br />Diversions 829 800 0.664 531.2 3.1 199.38$ 539.44$ <br />Finish Grading* 79.9 155.67$ 3,383.25$ <br />3,922.69$ <br />Total Regrade Costs 1,630,780.64$ <br />* Two Cat 16M Blades,2029.2 acres, 3.6782 acres per hour