My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-29_PERMIT FILE - C1981010A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2022-07-29_PERMIT FILE - C1981010A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 8:33:21 AM
Creation date
8/22/2022 3:05:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/29/2022
Doc Name
Bond Addendum Summary
Section_Exhibit Name
Appendix A Bond Addendum
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table A-2.7 Revegetation Unit Costs Page No.6 <br />Rangeland with Shrubs: (From TR-124 Circes Estimate) <br />Total Tilling Cost/Acre 96.50$ <br />Total Seed Mix Cost/Acre 354.70$ <br />Total Seed Application Cost/Acre 232.00$ <br />Total 683.20$ <br />Rangeland without Shrubs: (From RN-06 Circes Estimate) <br />Total Tilling Cost/Acre -$ <br />Total Seed Mix Cost/Acre 354.70$ <br />Total Seed Application Cost/Acre 232.00$ <br />Total 586.70$ <br />Table Equipment costs for Erosion Control Ditches <br />Fleet Cost <br /> Ownership Oper. Cost <br />Equipment Cost/Hour Cost/Hour Attachments*Operator Total <br />single shift <br />Cat D7R DS XR Series II SU 52.99 48.22 0 41.85$ 143.06$ <br />Light Plant 0 0 0 -$ -$ <br />Total 52.99 48.22 0 41.85$ 143.06$ <br />Dozer Fleet size 1 Dozers Fleet cost/hour 143.06$ <br />* Ripper costs included for ripping, omitted for grading
The URL can be used to link to this page
Your browser does not support the video tag.