My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (31)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 6:28:09 AM
Creation date
7/19/2022 3:22:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
BLM Environmental Assessment
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> vessel. Ref. Figure 3 in the EA. <br /> Fueling and servicing will be performed <br /> b. Fuel carefully in designated locations on the site. <br /> handling and There will be no other chemicals present or <br /> chemical usage handled onsite. In the case of a loss of N N N - <br /> (Spill Response containment, hydrocarbons and other materials <br /> Plan) will be promptly cleaned up using appropriate <br /> absorbents,and properly disposed of offsite. <br /> Fuel services will be conducted on private lands. <br /> Explosives to be stored in approved magazines <br /> onsite, as shown on maps.Magazines are State- <br /> and ATF-certified. Aaron Tezak is a licensed- -_-- <br /> blaster. Explosives handling will be by licensed <br /> employees. Copies of licenses are included with <br /> c. Blasting application. Blasting plan diagram is included in <br /> materials handling 4c.All safety regulations and license N N N and storage requirements will be followed. Proper <br /> notification of local, state, and federal authorities <br /> will be made in case of any reportable incident. <br /> Blasting licenses are current, no blasting <br /> materials will be stored on BLM lands. Blasting <br /> schedule dependent on production needs. <br /> Fuel/materials handling in designated locations, <br /> d. Spill with absorbent materials present nearby. <br /> prevention, control Contaminated soils will be removed and <br /> and properly disposed of offsite. Spills will be N N N <br /> countermeasures contained with standard commercial absorbent <br /> plan, if applicable materials. Secondary containment will depend <br /> on type of storage vessel. <br /> A-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.