Laserfiche WebLink
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> (i.e., tailings pond, <br /> as applicable) <br /> p. Development In processing,all material is conveyed to <br /> rock conveyance stockpiles. Ore is shipped offsite via tractor N N <br /> and transport, both trailer. N <br /> onsite and off <br /> q. Processing <br /> operations <br /> (primary crusher, See 4i above. <br /> secondary crusher, <br /> etc. <br /> r. Additional <br /> processes onsite N/A <br /> (batch plant, - -wash plant, etc. <br /> The pit benches and walls, consisting of obsidian <br /> and shaped to provide long-term geotechnical <br /> s. Interim stability,will remain in their mined N N <br /> reclamation configuration permanently. All areas of N - <br /> disturbance will be monitored for erosion and <br /> weeds and will be addressed in a timely manner. <br /> 5. Management Practices <br /> Diesel fuel, lubricants,and hydraulic fluid will <br /> be stored onsite,with secure and adequate <br /> secondary containment.No fuel/fluid storage on <br /> a. Containers BLM lands. Fuel storage will be on pit pad or Y N <br /> and tanks new processing area located on private lands. N - <br /> Spills will be contained with standard <br /> commercial absorbent materials. Secondary <br /> containment will depend on type of storage <br /> A-16 <br />