My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (31)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 6:28:09 AM
Creation date
7/19/2022 3:22:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
BLM Environmental Assessment
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> e. Solid&/or Trash will be collected and disposed of offsite. N N N <br /> hazardous waste See 5b and 5d above. - <br /> f. Hazardous N/A <br /> substances -The permitted site has an existing weed control <br /> plan, which will be continued to be implemented <br /> on all areas in the expansion. Recommendations <br /> and requirements of Custer County Weed <br /> Management will be included in the noxious <br /> g. Weeds weed control plan. Operator has a DRMS- N N N _ <br /> approved weed control plan for the 110 permit; <br /> the same plan will continue to be applied for the <br /> quarry expansion. Fremont County Weed <br /> Control has monitored and treated weeds and <br /> will continue to. <br /> h. Sanitary Sanitary facilities will be provided by use of a <br /> system <br /> Porta-Potty. Sanitary facilities will be located on N N N <br /> - <br /> private lands. <br /> i. Stockpiles -topsoil,product, Monitored for stability; p topsoil and overburden <br /> overburden/waste will be stabilized by use of native vegetation N N N <br /> material, process until needed for reclamation. Stability will be <br /> waste rock routinely monitored <br /> j. Additional <br /> material used for Ref. 5g and 5h <br /> blending <br /> k. Roads& Ref. 3a <br /> berms - - - <br /> 1. Water usage, There will be no water used in the mining and <br /> treatment,and processing. Discharge from the site will include Y N <br /> discharge <br /> surface runoff from affected and unaffected N <br /> areas, which will all be controlled by use of <br /> A-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.