Laserfiche WebLink
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> Working/Staging Floor- The existing stockpile <br /> and operations pad in the center of the pit will <br /> need to be replaced outside the pit floor, due to <br /> expansion and deepening of the pit. As the map Y N N <br /> shows, some pad and ramp will remain in the <br /> bottom of the pit,but the main processing and <br /> stockpiling area will be on a new pad area <br /> located west of the pit. <br /> Structures -Any necessary facilities, structures <br /> and materials storage areas will be on the new <br /> pad at the base of the pit or in the new Y N N <br /> processing pad to be established to the west of the pit.All structures will be located on private <br /> lands Ref.Figure 3 in the EA). <br /> e. Stationary, 2015 Screen Machine 4043T <br /> mobile and 2018 Terex Canica 200 Vertical Shaft Impactor <br /> processing Twin EIjay 6x20 Triple Deck Screen <br /> equipment. 5-60' Field Conveyors and I Radial Stacker <br /> Provide the 2010 Cummins 600KW Genset <br /> following- 1) <br /> Year,make, <br /> model;2)Function <br /> in the mining N N N <br /> operation; 3) <br /> Special 2-2019 Volvo L180H Wheel Loaders <br /> accommodations <br /> (white noise <br /> backup alarm, <br /> lighting, scrubber, <br /> etc. <br /> f Development SW Controls -Prior to mining, all additional Y N <br /> activities (Site stormwater controls downslope of the mine and N <br /> A-12 <br />