Laserfiche WebLink
COMPLIANCE TESTING AND SAMPLING <br /> Initial Testing Requirements <br /> 9. Initial testing is not required for this source. <br /> Periodic Testing Requirements <br /> 10. Periodic testing is not required for this source. <br /> ADDITIONAL REQUIREMENTS <br /> 11. The AIRS ID number must be posted in an easily visible location for ease of identification. <br /> (Reference: Regulation Number 3, Part B, III.E.) (State only enforceable) <br /> 12. The particulate emission control measures listed on the attached page (as approved by the <br /> Division) must be applied to the particulate emission producing sources as required by <br /> Regulation Number 1, III.D.1.b. <br /> 13. This permit is for the activities specified above; any additional process equipment (i.e. <br /> crushers, screens, etc.) to be located at this site must have a separate permit from the <br /> Division. (Reference: Regulation Number 3, Part B, I II.E.) <br /> 14. A Revised Air Pollutant Emission Notice (APEN) must be filed: (Reference: Regulation Number <br /> 3, Part A, II.C.) <br /> a. By April 30 of the year following a significant increase in emissions. A significant <br /> increase in emissions is defined as follows: <br /> For any criteria pollutant: <br /> For sources emitting less than 100 tons per year, a change in annual actual emissions <br /> of five (5) tons per year or more, above the level reported on the last APEN; or <br /> For sources emitting any amount of lead, a change in actual emissions of fifty (50) <br /> pounds of lead above the level reported on the last APEN submitted. <br /> For any non-criteria reportable pollutant: <br /> If the emissions increase by 50% or five (5) tons per year, whichever is less, above the <br /> level reported on the last APEN submitted to the Division. <br /> b. Whenever there is a change in the owner or operator of any facility, process, or <br /> activity; or <br /> C. Whenever new control equipment is installed, or whenever a different type of control <br /> equipment replaces an existing type of control equipment; or <br /> d. Whenever a permit limitation must be modified; or <br /> e. No later than 30 days before the existing APEN expires. <br /> COLORADO <br /> Air PottutionControl Division Page 3 of 7 <br /> C*Wmem of Public Hukh&Enwonmem <br />