Laserfiche WebLink
GENERAL TERMS AND CONDITIONS: <br /> 15. This permit and any attachments must be retained and made available for inspection upon <br /> request. The permit may be reissued to a new owner by the Division as provided in Regulation <br /> Number 3,.Part B, 11.13 upon a request for transfer of ownership and the submittal of a revised <br /> APEN and the required fee. <br /> 16. If this permit specifically states that final approval has been granted, then the remainder of <br /> this condition is not applicable. Otherwise, the issuance of this construction permit is <br /> considered initial approval and does not provide "final" approval for this activity or operation of <br /> this source. Final approval of the permit must be secured from the APCD in writing in <br /> accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, <br /> Part B, III.G. Final approval cannot be granted until the operation or activity commences and <br /> has been verified by the APCD as conforming in all respects with the conditions of the permit. <br /> Once self-certification of all points has been reviewed and approved by the Division, it will <br /> provide written documentation of such final approval. Details for obtaining final approval to <br /> operate are located in the Requirements to Self-Certify for Final Approval section of this <br /> permit. The operator must retain the permit final approval letter issued by the Division after <br /> completion of self-certification with the most current construction permit. <br /> 17. This permit is issued in reliance upon the accuracy and completeness of information supplied <br /> by the applicant and is conditioned upon conduct of the activity, or construction, installation <br /> and operation of the source, in accordance with this information and with representations <br /> made by the applicant or applicant's agents. It is valid only for the equipment and operations <br /> or activity(ies) specifically identified in this permit. If subsequent operations or testing at the <br /> source indicate the information supplied to obtain this permit and relied upon in the creation <br /> and issuance of this permit is inaccurate, the source must submit an application to modify the <br /> permit to address the inaccuracy(ies). (Reference: Regulation Number 3, Part B III.E.) <br /> 'v Y <br /> By: By: <br /> Greg Marcinkowski For: K.C. Houlden <br /> Permit Engineer Construction Permits Unit Supervisor <br /> Permit History <br /> Issuance Date Description <br /> XP1 October 24, 2002 Permit exemption issued to Colorado Quarries, Inc. <br /> Production decreased from 8,000 to 5,000 tons per <br /> XA1 May 18, 2018 year. Source is now below APEN reporting <br /> threshold, exemption letter issued. <br /> Issued to Colorado Quarries, Inc. Production <br /> Issuance 1 This Issuance increased from 5,000 tons per year, permit now <br /> required. <br /> ;a ICOLORADO <br /> Air Pollution Control Division Page 4 of 7 <br /> Department of PuWtt:Health&Enwonment <br />