My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-24_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2022-06-24_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 11:37:28 AM
Creation date
6/30/2022 11:29:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/24/2022
Section_Exhibit Name
EXHIBIT 68 Major Building & Structures As-Built Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />A. Topsoil Application <br />1. Unless otherwise directed by the Engineer in writing, ell areas desig- <br />~ nated to receive topsoil shall be scarified or tilled to a depth of <br />approximately 12 inches except on slopes too steep for a tractor. <br />These steep slopes will be scarified by hand. <br />2. Such loosening of the subsoil shall be done by discing, harrowing, or <br />other approved methods. <br />3. Topsoil shall be applied only when the subsoil is in a loose, friable <br />condition. <br />4. If the subsoil has become compacted or a surface crust has formed <br />~ subsequent to the initial loosening, it shall again be loosened im- <br />mediately prior to placing and spreading of the topsoa. <br />f 5. Topsoil shall be spread on the designated areas to the depth indicated <br />• hereinafter. <br />r 6. Six inches (6") of topsoil will be placed over all access road <br />embankments, subsoil stockpiles and pond embankments. <br />7. The loose depth of the topsoil shall be sufficient to allow the area to • <br />conform to the elevations shown on the Drawings after natural <br />settlement has taken place, but shall be at least 3 inches deep at all <br />locations. <br />~- 8. All large clods, hard lumps or stones over 3 inches in diameter, brush, <br />roots, stumps, litter and other foreign material shall be removed from <br />i the topsoiled area. <br />` 9. When the operation is completed, the area shall be in condition to <br />i-- receive seed, sod or other planting without further soil preparation. <br />I <br />` B. Topsoil Maintenance <br />The Contractor shall restore or replace any portion of the topsoa which <br />~- erodes or is otherwise damaged before final acceptance of the project. <br />L <br />i~ <br />,~_ • <br />L. 02810-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.