Laserfiche WebLink
" • The Contractor shall submit his plan for air testing of these lines to the"Engineer <br />seven (7) days before such tests are scheduled. The Engineer shall be notified <br />twenty-four (24) hours in advance of such tests so that he can inspect and observe <br />each such air test. <br />~• <br />• <br />02520-6 <br />