Laserfiche WebLink
I ^~ <br />CONSTRUCTION STEPS • <br />I. CONSTRUCT TRENCH FOR PIPE. <br />1 2. PLACE AND COMPACT CLAY FORMING CRADLE FOR PIPE TO SPRINGLINE. <br />r <br />3. CONSTRUCT TRENCH TO FORM BOTTOM HALF OF ANTI-SEEP COLLAR. <br />4. POUR ANTI-SEEP COLLAR WITH STEEL EXTENDING UPWARD THROUGH <br />CONSTRUCTION JOINT. <br />5. WRAP PIPE WITH MASTIC JOINT FILLER AT ANTI-SEEP COLLAR. <br />r 6. FORM AND POUR TOP HALF OF ANTI-SEEP COLLAR. <br />r 7. BACKFILL AND COMPACT AS SPECIFIED. <br />I <br />1 <br />' ~ BACKFILL WITH TYPE I OR LINE OF <br />' TYPE 2 MATERIAL ~ • , EXCAVATION ' • - <br />AS SPECIFIED ~ (TYPICAU <br />1.1,2 ~ .• •.• I•I/2 <br />. •.. • <br />~ 3~Max =~ ~ ~': 3~M <br />~_ , ~' ~. <br />%` i <br />COMPACT AND PREPARE <br />~ '~ ~ _ ~ GRADE TO THtS LINE PRIOR <br />~_ ~ ~ ~~ ~ TO CONSTRUCTING ANTI- <br />CONSTRUCTION JOINT ~ ~ SEEP COLLAR <br />TYPE I (CLAY) BACKFILL MATERIAL <br />NOTE <br />ALL DIMENSIONS OF AN•fl- <br />- SEEP COLLARS AND CLAY <br />- MATERIALS ARE AS SHOWN <br />ON THE PLANS. <br />L <br />TYPICAL ANTI-SEEP COLLAR <br />`~ CONSTRUCTION DETAIL <br />FOR PIPE WITHOUT CRADLE <br />N.T.S. • <br />L <br />02520-7 <br />