My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-06-24_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2022-06-24_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 11:37:28 AM
Creation date
6/30/2022 11:29:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/24/2022
Section_Exhibit Name
EXHIBIT 68 Major Building & Structures As-Built Summary
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,c SECTION 15105 - SLIDE G ATES AND FLAP GATES • <br />I PART1-GENERAL <br />(" 1.01 Description <br />I <br />Included in this section are the slide gates, flap gates and appurtenances. <br />r 1.02 Quality Assurance <br />The completely assembled slide gate, in vertical position, w>Zl be shop inspected for <br />(" proper seating. Seat facing for slide gates shall be machined and wedges adjusted <br />l to exclude a 0.004" thickness gauge between the frame and seating surfaces. The <br />gate slide shall be fully opened and closed in its guide system to insure that it <br />(' operates freely. Floor stands shall be shop operated to insure proper assembly and <br />operation. <br />1.03 Submittals <br />A. Shop Drawings . <br />C _ Submit shop drawings to the Engineer and Contractor showing principal <br />dimensions, general construciton, materials, weights, construction details, <br />certified head ratings, catalog data and descriptive literature to permit full <br />evaluation of the materials and equipment. <br />B. Test Reports <br />Submit certified copies of reports describing the procedure and results of <br />various tests completed. <br />C. Certificate of Compliance <br />Where various specifications are cited, such as AWWA or ASTM, submit <br />signed certificates of compliance from the manufacturer stating the equip- <br />ment meets those specifications. <br />1.04 Product Delivery, Storage and Handling <br />A. Delivery <br />All materials delivered to the site shall be inspected immediately to insure <br />that no damage has occurred during transit. <br />B. Storage of Products <br />The Contractor shall protect all products <br />temporary openings to prevent entrance <br />L. Products too large to store under cover in <br />minimum of two feet above ground. <br />,, <br />L <br />from damage, and plug all <br />of dirt or foreign material. <br />a building shall be stored a <br />• <br />r <br />15105-1 <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.