Laserfiche WebLink
094 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />107 <br />110 <br />111 <br />112 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />130 <br />132 <br />133 <br />134 <br />136 <br />137 <br />138 <br />139 <br />141 <br />142 <br />144 <br />145 <br />146 <br />147 <br />148 <br />149 <br />150 <br />151 <br />152 <br />153 <br />154 <br />Load and Haul Spoil to Poly ID T-5 (Map 35A) TRUCKI <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />308.05 <br />$1,099,330.00 <br />$748,142.00 <br />$2,489,137.00 <br />$4,466,437.00 <br />$4,599,066.00 <br />$10,466,519.00 <br />$11,850,722.00 <br />$4,465.00 <br />$116,734.00 <br />$20,103.00 <br />$1,872.00 <br />$6,105.00 <br />$2,447.00 <br />$3,229.00 <br />$217.00 <br />$110.00 <br />$1,062,957.88 <br />$7,454.00 <br />$8,285.00 <br />$18,839.00 <br />$553.00 <br />$240.00 <br />$3,118.00 <br />$1,823.00 <br />$9,263.00 <br />$432.00 <br />$32,514.00 <br />$10,440.00 <br />$4,814.00 <br />$1,884.00 <br />$13,423.00 <br />$15,730.00 <br />$5,181.00 <br />$6,291.00 <br />$9,323.00 <br />$1,577.00 <br />$835.00 <br />$800.00 <br />$3,339.00 <br />$1,948.00 <br />$3,711.00 <br />$2,041.00 <br />$2,170.00 <br />$3,058.00 <br />$592.00 <br />$7,202.00 <br />$174.00 <br />$1,125,761.00 <br />$216,878.00 <br />$2,815.00 <br />$7,140.00 <br />$24,771.00 <br />Load and Haul S oilto Poly ID T-6 (Map 35A) TRUCKI <br />209.64 <br />Load and Haul S oilto Poly ID T-7 (Map 35A) TRUCKI <br />697.49 <br />Load and Haul Spoil to Poly ID T-8 (Map 35A) TRUCKI <br />1,251.55 <br />Load and Haul Spoil to Pol ID T-9 (Map 35A TRUCKI <br />1,288.71 <br />Load and Haul Spoilto Poly ID T -I (Map 35A) TRUCKI <br />2,932.84 <br />Load and Haul Spoil to Poly ID T-2 (Map 35A) TRUCKI <br />3,320.71 <br />Regrade Go ssard Loadout DOZER <br />2.36 <br />Rip Facilities Area RIPPER <br />60.17 <br />Rip Coal Stockpile Area RIPPER <br />10.36 <br />Rip GossardLoadout RIPPER <br />0.96 <br />Rip Haul Road A and Haul Road B RIPPER <br />3.14 <br />Rip GossardLoadout Road RIPPER <br />1.26 <br />Regrade Gos sard Loadout Road DOZER <br />1.70 <br />Regrade Topsoil forAccess Road to PowerPole DOZER <br />(MR151) <br />0.45 <br />Res eed Road to Power Pole R151 REVEGE <br />0.80 <br />"Mine" Riprap fromSouth TaylorPit Temporary SITEMAINT <br />Stockpiles for ENANCE <br />0.00 <br />Regrade Gulch A Pond DOZER <br />30.76 <br />Regrade Prospect Pond DOZER <br />34.19 <br />Regrade Streeter Pond DOZER <br />77.75 <br />Regrade Gossard Loo Pond DOZER <br />2.28 <br />Regrade Rail Loop Pond DOZER <br />0.99 <br />Re rade Sewa e andAeration Pond DOZER <br />12.87 <br />Regrade Stoker Siding Pond DOZER <br />7.52 <br />Regrade Wash Bay Pond DOZER <br />38.23 <br />Regrade WashBay Sediment Sump DOZER <br />1.78 <br />Regrade Work Area Pond DOZER <br />134.18 <br />Regrade Section 16 Pond DOZER <br />43.08 <br />Regrade East Taylor Pond DOZER <br />19.87 <br />Regrade Taylor Pond DOZER <br />7.77 <br />Re rade Ta lorPu Holding Pond DOZER <br />55.40 <br />Regrade Section 28 Pond DOZER <br />64.92 <br />Regrade West Taylor Pond DOZER <br />21.38 <br />Remove and Regrade East Collection Ditch EXCAVATE <br />46.00 <br />Remove and Regrade South Collection Ditch EXCAVATE <br />68.17 <br />Remove and Regrade Prospect Collection Ditch EXCAVATE <br />11.52 <br />Remove and Regrade North Side Facilities Ditch EXCAVATE <br />6.10 <br />Remove and Regrade StokerDitch EXCAVATE <br />5.85 <br />Remove and Regrade West Side Facilities Ditch EXCAVATE <br />24.42 <br />Remove and Regrade West Pit Coal Road Ditch EXCAVATE <br />14.24 <br />Remove and Regrade Section 16 Pond Ditch EXCAVATE <br />27.13 <br />Remove and Regrade Section 16 Perimeter Ditch EXCAVATE <br />14.92 <br />Remove and Regrade Section 28 CollectorDitch EXCAVATE <br />15.87 <br />Remove and Regrade Section 29 Collector Ditch EXCAVATE <br />22.36 <br />Remove and Regrade 4Haul Road A Sediment EXCAVATE <br />Traps <br />4.32 <br />Remove and Regrade Six Post -Mining Stock EXCAVATE <br />Ponds <br />52.66 <br />Doze To soilPile 9A in WestPit DOZER <br />0.70 <br />Haul Topsoil from Stockpile 15A to Facilities Area TRUCKI <br />161.98 <br />Haul Topsoil fromPile 15B to WestPit TRUCKI <br />31.21 <br />HaulTopsoilfromStockpile 15E to Facilities Area TRUCKI <br />0.46 <br />Hau1To soil frornStockpile 15F to Facilities Area TRUCKI <br />1.16 <br />Haul Topsoil fromStoc Stockpile 15G to Facilities Area TRUCKI <br />3.56 <br />