My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-03_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2021-09-03_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2022 3:04:05 PM
Creation date
4/27/2022 2:00:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/3/2021
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Type & Sequence
TR149
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
753
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
155 <br />156 <br />157 <br />158 <br />159 <br />160 <br />161 <br />162 <br />163 <br />164 <br />165 <br />167 <br />168 <br />169 <br />170 <br />171 <br />172 <br />173 <br />174 <br />175 <br />176 <br />177 <br />178 <br />179 <br />180 <br />181 <br />182 <br />183 <br />184 <br />186 <br />187 <br />188 <br />189 <br />192 <br />193 <br />195 <br />196 <br />197 <br />Haul Topsoil from Stockpile 15H to Facilities Area <br />TRUCKI <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />7.94 <br />$48,725.00 <br />$35,048.00 <br />$258,506.00 <br />$140,678.00 <br />$941,615.00 <br />$897,611.00 <br />$14,457.00 <br />$9,117.00 <br />$546,733.00 <br />$16,145.00 <br />$18,282.00 <br />$77,104.00 <br />$57,825.00 <br />$4,819.00 <br />$3,526.00 <br />$2,292.00 <br />$3,703.00 <br />$441.00 <br />$1,322.00 <br />$2,557.00 <br />$529.00 <br />$3,174.00 <br />$617.00 <br />$3,350.00 <br />$4,055.00 <br />$1,499.00 <br />$441.00 <br />$2,733.00 <br />$2,204.00 <br />$2,204.00 <br />$17,370.00 <br />$8,146.37 <br />$50,459.58 <br />$229,215.00 <br />$41,088.00 <br />$562,512.00 <br />$380,733.00 <br />$275,800.00 <br />HaulTopsoilfromStockpile 15ItoHaul Road A <br />(TRI 19) <br />TRUCKI <br />5.71 <br />Haul Topsoil fromPile 16A to WestPit <br />TRUCKI <br />37.20 <br />Haul Topsoil fromPile 16C to South TaylorPit <br />TRUCKI <br />20.24 <br />Haul Topsoil fromPile 16D to South TaylorPit <br />TRUCKI <br />135.49 <br />Haul Topsoil fromPile 16E to South TaylorPit <br />TRUCKI <br />129.16 <br />Haul Topsoil fromPile 17A to Haul Road A <br />(TRI 19) <br />TRUCKI <br />2.08 <br />Haul Tops oil from Stockpile 17A - 17E to Gossaid <br />Loadout <br />TRUCKI <br />1.49 <br />Haul Topsoil from Stockpile 18 to South TaylorPit <br />TRUCKI <br />70.45 <br />Haul Topsoil from Stockpile 27A to HaulRoadA <br />(TRI 19) <br />TRUCKI <br />2.08 <br />Doze Tops oil fromWindrow 1- Windrow in <br />West Pit <br />DOZER <br />37.70 <br />Replace 48" of Tops oil on Aspen StudyArea <br />TRUCKI <br />11.09 <br />Replace 48" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />8.32 <br />Replace 4" ofTopsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />0.69 <br />Replace Topsoil fromStockpile to Gulch A Pond <br />DOZER <br />14.13 <br />Replace Topsoil fromStockpile to ProspectPond <br />DOZER <br />9.19 <br />Replace Topsoil from Stockpile toStreeterPond <br />DOZER <br />14.84 <br />Replace Topsoil fromStockpile to Rail Loop Pond <br />DOZER <br />1.77 <br />Replace Topsoil fromStockpile to GossardPond <br />DOZER <br />5.30 <br />Replace Topsoil fromStockpile to Sewage and <br />Aeration Pond <br />DOZER <br />10.25 <br />Replace Topsoil fromStockpile to Stoker Siding <br />Pond <br />DOZER <br />2.12 <br />Replace Topsoil fromStocile to WashBay Pond <br />DOZER <br />12.72 <br />Replace Topsoil fromStockpile to WashBay <br />Sediment Sump <br />DOZER <br />2.47 <br />Replace Topsoil fromStockpile to WorkArea <br />Pond <br />DOZER <br />13.43 <br />Replace Topsoil fromStockpile to Section 16 Pond <br />DOZER <br />16.25 <br />Replace Topsoil fromStockpile to East Taylor <br />Pond <br />DOZER <br />6.01 <br />Replace Topsoil fromStockpiletoTaylorPump <br />Holding Pond <br />DOZER <br />1.77 <br />Replace Topsoil fromStocile to WestPit Pond <br />DOZER <br />10.95 <br />Replace Topsoil fromStockpile to Section 28 Pond <br />DOZER <br />8.83 <br />Replace Topsoil fro mTop soil Pile 17F to West <br />Ta lorPond <br />DOZER <br />8.83 <br />Replace Topsoil fromStockpile to Collection <br />Ditches <br />EXCAVATE <br />127.02 <br />Plug and Seal All Wells and Piezometers for EP, <br />WP and STP <br />BOREHOLE <br />28.00 <br />Seal South Taylor In-Pit Exploration Holes <br />(MR153+MR158 <br />BOREHOLE <br />164.00 <br />Reseed East Pit with Grazing Land Seed Mix <br />REVEGE <br />207.00 <br />Res eedEast Pit with Sagebrush Steppe SeedMix <br />REVEGE <br />27.00 <br />Res eed West Pit and Facility Area with Grazing <br />Land Seed Mix <br />REVEGE <br />508.00 <br />Reseed West Pit with Sagebrush Steppe Seed Mix <br />REVEGE <br />249.00 <br />Reseed South TaylorPit with Grazing Land Seed <br />Mix <br />REVEGE <br />249.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.