Laserfiche WebLink
039 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />047 <br />048 <br />049 <br />050 <br />051 <br />052 <br />053 <br />054 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />091 <br />092 <br />093 <br />Doze Poly ID D-5 (Map 35A) DOZER <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />44.27 <br />$85,886.00 <br />$432,877.00 <br />$76,067.00 <br />$51,578.00 <br />$42,758.00 <br />$43,936.00 <br />$204,830.00 <br />$271,937.00 <br />$20,160.00 <br />$51,727.00 <br />$100,120.00 <br />$16,589.00 <br />$20,739.00 <br />$88,135.00 <br />$59,082.00 <br />$13,199.00 <br />$59,419.00 <br />$91,765.00 <br />$513,431.00 <br />$141,893.00 <br />$154,272.00 <br />$142,980.00 <br />$112,029.00 <br />$144,068.00 <br />$42,023.00 <br />$158,072.00 <br />$35,436.00 <br />$169,366.00 <br />$91,695.00 <br />$27,161.00 <br />$11,729.00 <br />$24,954.00 <br />$31,498.00 <br />$72,316.00 <br />$112,569.00 <br />$18,704.00 <br />$228,788.00 <br />$308,121.00 <br />$36,766.00 <br />$95,755.00 <br />$633,622.00 <br />$1,034,991.00 <br />$248,387.00 <br />$303,984.00 <br />$62,917.00 <br />$11,212.00 <br />$17,852.00 <br />$28,139.00 <br />$36,141.00 <br />$11,759.00 <br />$111,257.00 <br />$1,865,532.00 <br />$1,146,031.00 <br />$2,919,716.00 <br />$1,916,589.00 <br />Doze Poly ID D-6 (Map 35A) DOZER <br />223.15 <br />Doze Poly ID D-7 (Map 35A) DOZER <br />39.21 <br />Doze Poly ID D-8 (Map 35A) DOZER <br />26.59 <br />Doze Poly ID D-9 (Map 35A DOZER <br />22.04 <br />Doze Poly ID D-10 (Map 35A) DOZER <br />22.65 <br />Doze Poly ID D-11 (Map 35A) DOZER <br />105.59 <br />Doze Poly ID D-12 ap 35A DOZER <br />140.18 <br />Doze Poly ID D-13 (Map 35A) DOZER <br />10.39 <br />Doze Poly ID D-14 (Map 35A) DOZER <br />26.67 <br />Sca er Poly ID S-28 (Map 35A) SCRAPERI <br />34.66 <br />ScaperPoly ID S-29 (Map 35A) SCRAPERI <br />5.74 <br />Sca er Poly IDS -30 (Map 35A SCRAPERI <br />7.18 <br />ScaperPolyID5-31 (Map35A) SCRAPER1 <br />30.52 <br />ScaperPoly ID S-32 (Map 35A) SCRAPERI <br />20.46 <br />Sca er Poly IDS -33 (Map 35A SCRAPERI <br />4.57 <br />ScaperPoly ID 5-34 (Map 35A) SCRAPER1 <br />20.57 <br />Sca er Poly ID S-35 (Map 35A) SCRAPER1 <br />31.77 <br />Sca er Poly ID S-36 (Map 35A) SCRAPERI <br />177.77 <br />ScaperPoly ID 5-37 (Map 35A) SCRAPERI <br />49.13 <br />Sca er Poly IDS -38 (Map 35A) SCRAPERI <br />53.41 <br />ScaperPoly ID 5-39 (Map 35A) SCRAPER1 <br />49.50 <br />Sca er Poly ID S-40 (Map 35A) SCRAPERI <br />38.79 <br />Sca erPol ID5-41 a 35A SCRAPERI <br />49.88 <br />ScaperPoly IDS-1 (Map 35A) SCRAPER1 <br />14.55 <br />Sca er Poly ID S-2 (Map 35A) SCRAPERI <br />54.73 <br />Sca er Poly ID S-3 (Map 35A SCRAPERI <br />12.27 <br />ScaperPoly ID S-4 (Map 35A) SCRAPERI <br />58.64 <br />Sca er Poly ID S-5 (Map 35A) SCRAPER1 <br />31.75 <br />ScaperPoly ID S-6 (Map 35A) SCRAPER1 <br />9.40 <br />Sca er Poly ID S-7 (Map 35A SCRAPERI <br />4.06 <br />Sca er Poly ID S-8 (Map 35A SCRAPERI <br />8.64 <br />ScaperPoly ID S-9 (Map 35A) SCRAPERI <br />10.91 <br />ScaperPoly ID S-10 (Map 35A) SCRAPERI <br />25.04 <br />ScaperPoly ID 5-11 (Map 35A SCRAPERI <br />38.97 <br />ScaperPoly ID 5-12 (Map 35A) SCRAPER1 <br />6.48 <br />Sca er Poly ID S-13 (Map 35A) SCRAPER1 <br />79.21 <br />ScaperPoly ID S-14 (Map 35A) SCRAPER1 <br />106.68 <br />Sca erPol IDS -15 (Map 35A SCRAPERI <br />12.73 <br />Sca er Poly ID 5-16 (Map 35A) SCRAPER1 <br />33.15 <br />ScaperPoly ID 5-17 (Map 35A) SCRAPER1 <br />219.38 <br />ScaperPoly ID S-18 (Map 35A SCRAPERI <br />358.35 <br />Sca er Poly IDS -19 (Map 35A SCRAPERI <br />86.00 <br />ScaperPoly ID 5-20 (Map 35A) SCRAPERI <br />105.25 <br />Sca erPol IDS -21 (Map 35A) SCRAPER1 <br />21.78 <br />ScaperPoly ID S-22 (Map 35A) SCRAPERI <br />3.88 <br />Sca er Poly IDS -23 (Map 35A SCRAPERI <br />6.18 <br />Sca er Poly ID 5-24 (Map 35A) SCRAPER1 <br />9.74 <br />ScaperPoly ID5-25 (Map 35A) SCRAPER1 <br />12.51 <br />Sca er Poly ID S-26 (Map 35A SCRAPERI <br />4.07 <br />Sca er Poly IDS -27 (Map 35A SCRAPERI <br />38.52 <br />Load and Haul Spoil to Pol ID T-1 (Map 35A TRUCKI <br />522.66 <br />Load and Haul S oilto Poly ID T-2 (Map 35A) TRUCKI <br />321.13 <br />Load and Haul Spoilto Poly ID T-3 (Map 35A) TRUCKI <br />818.14 <br />Load and Haul Spoil to Poly ID T-4 (Map 35A) TRUCKI <br />537.05 <br />