Laserfiche WebLink
Overburden removal at Collom Pit. <br /> EXPLOSIVES—Rule 4.08 <br /> Distance Prohibitions 4.08.4;Warnings 4.08.4; Control of Adverse Effects 4.08.4: <br /> A blast occurred at the South Taylor Pit during the inspection at approximately 12 PM. The blast was not <br /> observed. <br /> Blast area in South Taylor Pit. <br /> FISH and WILDLIFE—Rule 4.18: <br /> Approximately 200 head of elk was observed in the East Pit. Deer and pronghorn were found throughout the site. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage —Acid and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> The Final East Pit Ditch was walked. Water was actively flowing through the ditch at the time of the inspection. <br /> The ditch remained stable with no issues observed.The lower portion of North Trib. East Pit Ditch and Prospect <br /> Ditch was inspected. The ditches were dry and stable. <br /> Upper portions of Taylor and East Taylor Ditches were inspected and no issues were observed. <br />