Laserfiche WebLink
Prospect Pond was inspected.A new trash rack and anti-vortex inlet was installed in primary spillway.The pond <br /> held water but was not discharging during the inspection. The pond was stable with no issues observed. <br /> Collom Ponds inspected were Section 26, Sidehill and Section 25 Ponds.The Sidehill Pond was dry at the time of <br /> inspection. Section 26,located just downslope of Sidehill,held water and was discharging. Section 25 Pond also <br /> held water but was not discharging.All ponds were stable with no issues.The Section 25 is scheduled for final <br /> remaining maintenance once water levels allow for work to be completed. <br /> A. <br /> Section 25 Pond. Prospect Pond. <br /> Final East Pit Ditch. <br /> SLIDES and DAMAGE -Rule 4.12: <br /> Minor Tilling is observed along the north facing slope within the Final East Pit Ditch area. <br />