Laserfiche WebLink
Backfilling and grading (B & G),topsoiling and seeding comprised zero acres. Backfilling and grading <br /> are discussed in Section 1.2.2, and indicated on Table 1.1 of Appendix W. <br /> The location and the number of acres topsoiled during 2021 are discussed in section 1.2.3, and indicated <br /> on Table 1.1 of Appendix W. The number of acres coincides with the number of acres backfilled and <br /> graded. <br /> Map I of Appendix W depicts all previously planted parcels at the site. Each parcel identifies <br /> the acres and the year seeding occurred. <br /> Trapper permanently seeded zero acres of land in 2021. Acres seeded during 2021 are discussed in <br /> section 1.2.4 of Appendix W. Revegetation seed mixes are discussed in section 7.3 and associated tables <br /> of the report. Trapper included an invoice from Stevenson Intermountain Seed, Inc. in Section 7 of <br /> Appendix W illustrating the reclamation seed mix utilized. <br /> Section 1.2.5 of Appendix W discusses the cultural practices conducted in 2021. Separate sections in <br /> the report discuss each unique practice. Cultural practices include and are not limited to: <br /> o Drainage reconstruction <br /> o Development drilling <br /> o Topsoil pile construction <br /> Rule 2.04.13 (2): <br /> Section 3 of the report indicates that improvements and repairs were conducted on reconstructed <br /> drainages. No new drainage construction occurred in 2021. In 2021 approximately 550 feet of drainage <br /> reconstruction took place in Deal Gulch as per Map 1. Dredging of and dozer basins occurred in the <br /> following systems: <br /> Johnson East Pyeatt Middle Flume <br /> West Pyeatt Oak East Middle Flume <br /> East Pyeatt Ponds#1 and#2 and Deal Gulch Pond 91 where dredged. <br /> Table 5-lin Section 5 of Trappers report provides geographic locations for each of the topsoil stockpiles <br /> and the approximate volume stored in each pile. Topsoil stockpiles are depicted on the maps associated <br /> with the submission in Appendix W. Over the course of 2021 two new topsoil piles were constructed. <br /> Stock tanks and dozer basins are discussed in Section 6.0 of the report. <br /> In accordance with section 3.6.3.5 of Trapper's permit, Trapper Mine must provide the Division with the <br /> proposed list of plant species to be used each year. It appears per Tables 7-lthrough 7-4 of the ARR <br /> submission the number of species for plant type (grasses,fortis and, shrubs) and the amount of seeds to <br /> be applied are in accordance with Trapper's approved seed mixtures. <br />