Laserfiche WebLink
Fjkl= <br /> @YomanSafety,Health,and Environmental Action Plan <br /> Hard Scrabble/S Bar C Bond Forfeiture Project <br /> Iron Woman Construction and Environmental Services,LLC <br /> Page 4 of 22 <br /> 1.3 Project Background <br /> The project consists of multiple sites located in Lamar, CO This Health and Safety Plan was prepared to <br /> address the activities associated with potential occupational exposures to the following known hazards: <br /> • Human and construction equipment interface <br /> • High Walls <br /> • Bodies of Water <br /> • Slips,trips and falls <br /> • Physical Exertion <br /> Iron Woman Construction(Iron Woman)is contracted to conduct the following activities at the Job Site: <br /> 1. Hard Scrabble —Reduction in peninsula of overburden highwall by dozing material in water <br /> body. Reseeding of area once work completed. <br /> 2. S Bar C—Removal of highwall around pond by dozing material into water body. Transport and <br /> installation of topsoil to worked area and re-seeding of site. <br /> 1.4 Site Specific Safety Concerns <br /> In addition to the typical safety concerns associated with any construction project there are some site- <br /> specific safety concerns associated with each of the project sites. <br /> S Bar C Mine Site <br /> Hazard: Water Body—The majority of the work to be performed at this site is the reduction of a high- <br /> wall surrounding the old mine which is now a pond. The depth of this pond is approximately 20' with an <br /> immediate drop off at the water's edge. <br /> Mitigation: During high-wall reduction operations ground personnel will monitor the dozer operations <br /> and communicate with the operator via hand signal as to when they are approaching the water's edge. <br /> Material will be pushed into the water and will be continually monitored by ground personnel who will <br /> maintain a line of site with the operator at all times. <br /> Hazard: Topsoil placement on slope—Topsoil will be imported from nearby stockpile and dumped using <br /> an off-road end dump near the shoulder of the 3:1 cut. <br /> Mitigation: Driver will take care to insure they are either placing material at the shoulder of the <br /> embankment or will back down slope with assistance from ground personnel to place material on the <br /> slope.All dumping will occur with truck parallel to slope. <br /> Hard Scrabble Mine Site <br /> Hazard: Water Body—The reduction of the highwall peninsula at hard scrabble will face the same water <br /> body challenges as the S Bar C site. <br /> Mitigation: During high-wall reduction operations ground personnel will monitor the dozer operations <br /> and communicate with the operator via hand signal as to when they are approaching the water's edge. <br /> Material will be pushed into the water and will be continually monitored by ground personnel who will <br /> maintain a line of site with the operator at all times. <br />