My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-05_GENERAL DOCUMENTS - M1992076
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1992076
>
2017-04-05_GENERAL DOCUMENTS - M1992076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 2:52:55 PM
Creation date
2/17/2022 10:02:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992076
IBM Index Class Name
General Documents
Doc Date
4/5/2017
Doc Name Note
Hard Scrabble/ S Bar C bond Forfeiture Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRE PROTECTION <br /> Specific procedures must be developed by the CONTRACTOR to ensure that X <br /> fire hazards are addressed and controlled. <br /> Use, storage and segregation of flammable and combustible materials must be X <br /> in accordance with NFPA regulations. <br /> Contractor will immediately notify Colorado Division of Reclamation, Mining X <br /> and Safety project manager of any fire emergency. <br /> Provision for fire response must be addressed in plan approved by Colorado X <br /> Division of Reclamation, Mining and Safety. <br /> Fire extinguishers must provided for all mobile equipment and at all areas X <br /> where hot work is being performed. <br /> Fire extinguishers must be maintained and inspected in accordance with X <br /> MSHA/OSHA regulations on/in all mobile equipment. <br /> Costs for these measures will not be itemized and must be included within the bid <br /> schedule items. <br /> The CONTRACTOR should provide a signature block similar to the one below that each <br /> employee can sign to verify that they have read and understand the safety aspects of the <br /> project, and accept the provisions of the SHEAP. <br /> The above information was reviewed, received, and understood. <br /> Contractor Representative: <br /> Signature Date <br /> Employee: <br /> Signature <br /> 3/12/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.