Laserfiche WebLink
GENERAL CONDITIONS OF THE CONTRACT <br /> DEFINITIONS <br /> A. Contract Documents. The Contract Documents consist of: <br /> (a) Agreement and Bid Schedule; <br /> (b) Performance and Payment Bonds; <br /> (c) Liability, Automobile and Workmen's Compensation Certificates of Insurance; <br /> (e) Notice to Proceed; <br /> (f) General Conditions of the Contract; <br /> (g) Detailed Special Conditions, including all amendments issued prior to the opening of <br /> the bids and including any applicable Standard Work Specifications; <br /> (h) Maps and drawings, including all amendments issued prior to the opening of the <br /> bids; <br /> (i) Final inspection and certificate of completion; <br /> (j) Notice of CONTRACTORS Settlement, and <br /> (k) List of Equipment Offered. <br /> B. Procedural Documents. The Procedural Documents consist of: <br /> (a) Advertisement for Bids; <br /> (b) Bid form; <br /> (c) Bid Bond; <br /> (d) Notice of Award; <br /> (e) MBE/WBE Forms; and <br /> (f) AML Contractor Ownership and Control Information Package (AVS); <br /> (g) Three-Way Agreement for Reclamation Activities, if required <br /> C. Correlation and Intent of the Documents <br /> The Contract Documents are complementary; what is called for by any one document shall be as <br /> binding as if called for by all. The intention of the documents is to include all labor and materials, <br /> equipment and transportation necessary for the proper execution of the work. Materials or work <br /> described in words which have a well-known technical or trade meaning shall be held to refer to <br /> such recognized standards. <br /> In case of a difference between the contract documents, precedence shall be given in the following <br /> respective order: Agreement, Special Conditions, Bid Schedule, Standard Work Specifications, <br /> Maps, Drawings, and General Conditions. Amendments shall take precedence in the area of the bid <br /> document which they modify or clarify. In the case of any such difference, the matter shall be <br /> promptly brought to the attention of the Principal Representative who will make a determination in <br /> writing. <br /> D. Words and Terms Used <br /> AGREEMENT- The word Agreement means the written Agreement entered into by the State of <br /> Colorado acting by and through the Principal Representative and the CONTRACTOR for the <br /> performance of the work and payment for the work. <br /> COLORADO LABOR - The term Colorado Labor shall be defined as provided in Title 8-17-101, et <br /> seq. CRS 1973, as amended. <br /> CONTRACTOR - The term CONTRACTOR means the sole proprietorship, partnership, or <br /> corporation entering into a Contract with the State of Colorado. <br /> Colorado Division of Reclamation, Mining and Safety <br /> Page 1 of 22 Pages <br /> Revised: 8/25/2015 <br />